Committee Meetings:

 

ENVIRONMENTAL PLANNING COMMITTEE MEETING:

Committee: Ken Kary, Dan Anderson, Dan Garry

 

*The purpose of the Environmental Planning Committee meeting is to review:

EAS #9-10-26 - Construction of thirty-four (34) buildings that will consist of one hundred twenty-three (123) townhome units located on Kirtland Road and identified as Permanent Parcel Number 21-A-022-0-00-033-0 (Everett Woods).

 

FOR THE RECORD:   I want to mention that the Planning Commission has approved EAS #9-10-26

 

With this information, the Environmental Planning Committee recommends the passage of EAS 9-10-26 this evening

  

AGENDA

REGULAR COUNCIL MEETING

November 17, 2026

 

*POLICE DEPARTMENT CEREMONIAL SWEARING IN & AWARDS

I am running a few minutes late; my previous meeting is running over.

 

Police Department Ceremonial Swearing In & Awards

Mayor Fiala swore in Patrol Officers Daniel Elliott, Thomas Stephens, Andrew Mastrocola and Joseph Powell, Sergeants Daniel Lastoria and Jackson Hyams and Lieutenants Brad Lampella and Kevin Rastall.

 

Police Chief Schultz presented the 2024 Officer of the Year award to Ross Shirley, the 2024 Special Officer of the Year award to Chuck Popik, the 2024 Civilian Member of the Year award to Kathy Fellows. He presented the 2025 Officer of Year award to Fred Brown, the 2025 Special Officer of the Year award to Thomas Rovniak and the 2025 Civilian Member of the Year award to Kiersten Mastrocola.

 

 

 

 

APPROVAL OF MINUTES-

Regular Council Meeting of October 20 & November 3, 2026

 

STANDING AND REGULAR COMMITTEE REPORTS

No major reports

 

CORRESPONDENCE

No correspondence

 

 

PUBLIC PORTION

Heath Wenzel, 4404 River Street, Willoughby - See Exhibit A.

 

Adam Kalish, 1204 Windermere Drive, Willoughby, Ohio –

Mr. Kalish stated that he is a Master of Public Health student and paramedic, and he is urging the City to invest in public-access automated external defibrillators (AEDs) in City parks. He stated that the City has 185 acres of parkland where families gather, athletes compete, and residents of all ages enjoy recreational activities. While these spaces promote health and wellness, they also present the possibility of sudden cardiac arrest. Each year, more than 350,000 people in the United States suffer an out-of-hospital cardiac arrest, and fewer than 15% survive. As a paramedic, he stated that when EMS arrives at the scene of a cardiac arrest, the outcome is often determined by what happened before paramedics get there. Immediate bystander CPR and, most importantly, early defibrillation with an AED are the key factors that improve survival. CPR helps maintain blood flow, but the treatment most likely to restore a normal heart rhythm is a shock delivered by an AED. Installing AEDs throughout the City's park system would give bystanders the ability to act in those critical first minutes. AEDs are designed for public use, require little to no training, and provide clear step-by-step voice instructions once activated. No one can control when a cardiac arrest occurs, but one can improve a person's chance of survival by ensuring that lifesaving equipment is readily available where people gather. An AED in the City's parks could mean the difference between life and death.

 

UNFINISHED BUSINESS

 

RESOLUTION NO. 2026-130 - Third Reading Motion carried 6 to 0

A resolution authorizing the Mayor to enter into a General Maintenance and Lighting Replacement Project Agreement, by and among the Lake County Board of Commissioners and the cities of Willoughby, Eastlake, Mentor, Painesville, Wickliffe and Willowick, for Maintenance and Lighting of Route 2.

 

Roll Call   6 yes

0 no

1 abstain (Anderson)

 

 

NEW BUSINESS

 

RESOLUTION NO. 2026-137                              Motion carried 7 to 0

A resolution authorizing the Mayor to enter into a Memorandum of Understanding between the City of Willoughby and the Lake County Regional Transit Authority, and declaring an emergency.

 

Mayor Fiala stated this legislation authorizes the City to begin the design, specification, and bidding process for the project. Initially, the Northeast Ohio Areawide Coordinating Agency (NOACA) awarded $1.5 million to be divided equally among Willowick, Eastlake, and Willoughby. Through additional funding secured by Laketran, Willoughby’s allocation increased from $500,000 to $711,398. The City's required contribution is $177,849.

 

Mayor Fiala stated the project will include streetscape improvements beginning near Third Street along the south side of Vine Street and extending to either Skiff or Church Street or as far as available funding allows. Due to varying building setbacks, elevations, utility poles, columns, and other site constraints, the corridor presents several design challenges. The current plan is to extend improvements to Church Street, with the long-term goal of reaching Skiff. Design work has only recently begun, and no final plans are available for presentation at this time.

 

Mr. Tomaselli asked if this project relates to the study conducted a year or two ago to create a more uniform appearance along Vine Street? Mayor Fiala stated this is exactly the objective. The project is intended to establish a consistent streetscape design along the Vine Street corridor. Willowick will begin improvements at Lakeshore Boulevard and proceed east. Eastlake, which serves as the central portion of the corridor, will work in both directions from that intersection. Willoughby will proceed west. The long-term vision is to connect all three communities through a coordinated and consistent streetscape design along Vine Street.

 

RESOLUTION NO. 2026-138                              Motion carried 7 to 0

A resolution declaring it necessary and determining to proceed with acquiring, constructing, installing equipping, improving, maintaining and repairing improvements necessary for making improvements to abate erosion along properties within the City included within the Lake County Communities Shoreline Special Improvement District, together with all necessary appurtenances thereto, and declaring an emergency.

 

Mayor Fiala explained that Resolution Nos. 2026-138 and 2026-139 are companion pieces of legislation. Resolution No. 2026-138 serves as the enabling legislation, while Resolution 2026-139 initiates the assessment process for two North Beachview property owners, the Angelo and Johnson families. He noted that the process took longer than anticipated because applications are administered through the Lakefront Shoreline Improvement District (SID), a consortium of 15 communities that consolidates funding applications annually rather than processing them individually. This approach makes financing more attractive to lenders and streamlines approval by the SID Board. Approval of these resolutions will authorize the assessments for the two properties, and the full SID Board is expected to meet within the next two weeks to approve all pending applications from participating communities. Funding distributions are anticipated by mid-December.

 

Mr. Carr asked whether the homeowners had already completed the shoreline stabilization work or if the funding would be used for future projects. Mayor Fiala stated that he could not definitively answer but believed that some of the work may have already been completed. Mr. Carr noted that aerial imagery appeared to show existing erosion control improvements along the shoreline.

 

Mayor Fiala explained that these projects are relatively modest in scale, estimated at approximately $50,000 to $70,000, compared to some Lakefront SID projects that have exceeded several hundred thousand dollars. He reminded Council that the Lakefront Shoreline Improvement District was created to provide residents with access to funding for erosion control measures. Under the program, property owners are reimbursed for eligible project costs, and the repayment obligation is placed on the property's tax duplicate. The assessment remains with the property and transfers to subsequent owners upon sale, allowing homeowners to complete necessary erosion control improvements without obtaining a traditional bank loan or mortgaging their home.

  

ORDINANCE NO. 2026-139                                Motion carried 7 to 0

An ordinance levying special assessments for acquiring, constructing, installing equipping, improving, maintaining and repairing improvements necessary for making improvements to abate erosion along properties within the City included within the Lake County Communities Shoreline Special Improvement District, together with all necessary appurtenances thereto, and declaring an emergency.

RESOLUTION NO. 2026-140                              Motion carried 7 to 0

A resolution approving Change Order No. 4 in the Osborne Park Coastal Improvements Phases 1 and 2 with Mark Haynes Construction, Inc., and declaring an emergency.

 

Ms. Keller introduced Tim Wagner of SmithGroup and using the overhead projector she indicated that it showed the four areas that are included in the Osborne Park change order. The first modification involves the terrace steps, highlighted in orange. The original concept included terrace steps, a patio up top, and a break wall at an estimated cost of nearly $750,000. To reduce costs, those items were removed, reducing the terrace step component to approximately $278,000. To maintain a strong visual focal point, a new ground-level patio, shown in yellow, has been added behind the steps which is about 16’ deep and approximately 2,070 square feet.

 

She stated that the change order also includes a lower patio area, shown as the green triangle, and additional erosion control at both beaches, shown in purple, to help control erosion and keep sand and stone in place.

 

Mr. Carr asked whether the reduction in cost would affect the appearance of the terrace steps and the anticipated “wow factor” of the project. Ms. Keller stated that the steps themselves remain unchanged from the original design. The only modification is the elimination of the elevated patio and retaining wall in favor of a ground-level patio behind the steps that can accommodate seating and gathering spaces.

 

Mr. Anderson asked about the dimensions and maintenance requirements of the terrace steps. Mr. Wagner explained that the design includes terraced seating walls with a 16-foot-wide grass section between seating levels. The grass area has been graded to allow mowing with standard maintenance equipment, including a zero-turn mower. He compared the concept to the solstice steps in Lakewood but noted that Osborne Park’s design incorporates improved drainage and grading to facilitate maintenance and avoid issues experienced elsewhere.

 

Mr. Tomaselli asked why the additional curbing and shoreline protection elements had not been included in the original design. Mr. Wagner explained that many of the changes were the result of field conditions encountered during construction rather than design omissions. These included slope failures, wetland conditions, sand and clay seams, and other constructability issues that required adaptive solutions. He noted that armor stone and additional stabilization measures were added where necessary to address site conditions and improve long-term shoreline performance. He also explained that the lower patio area was changed from asphalt to concrete because it better complements the surrounding design and enhances durability and appearance.

 

Mr. Wagner reported that Osborne Park is approximately 60% to 70% complete, with shoreline protection structures nearly finished. Current work includes construction of bridge abutments, installation of safety railings, stormwater improvements, and site grading. More than 20,000 tons of armor stone have been installed throughout the project. A prefabricated bridge is expected to arrive between Christmas and New Year’s, and the addition of the terrace steps is not anticipated to affect the project schedule. Construction remains on track for substantial completion in the spring, with weather permitting.

 

Mr. Anderson asked when a ribbon-cutting ceremony might take place. Ms. Keller responded that the project team is targeting mid-June, allowing sufficient time for grass, landscaping, trees, and other plantings to become established. Mayor Fiala stated that the timing is largely dependent upon successful establishment of the vegetation.  Mr. Wagner stated that contractors resumed hauling excess soil from the site. Ms. Keller explained that the large stockpile near the soccer field will be entirely reused for the Chagrin River Trail project. Mr. Wagner explained that nearly all of the stone was sourced from a quarry near Sandusky and consists of large limestone blocks weighing between one and six tons each, depending on location within the shoreline structures.

 

 

RESOLUTION NO. 2026-141                              Motion carried 7 to 0

A resolution approving EAS #9-10-26 for construction of thirty-four (34) buildings that will consist of one hundred twenty-three (123) townhome units located on Kirtland Road and identified as Permanent Parcel Number 21-A-022-0-00-033-0 (Everett Woods).

 

 

NOTE:

For accuracy, this section has been copied from the council meeting minutes

 

MAYORS REPORT

 

Mayor Fiala thanked Council for the passage of Resolution 2026-

130. With the approval, the City becomes the second-to-last participating community to approve the agreement. Only one City remains, and it is scheduled to vote on November 23rd. Once that approval is secured, the agreement will be finalized and forwarded to the County Commissioners. The County Commissioners have already authorized the engineering work for the Route 2 lighting replacement project, and the current timeline calls for the project to be bid in January or February of next year.

 

Mr. Carr asked if any information has been received regarding how the appointment process will work regarding a new judge for the Willoughby Municipal Court. Mayor Fiala stated the process will depend on when Judge Cornachio vacates the position. If she steps down before the end of the year, the current governor will make the appointment. If she remains in office into the spring, the next governor will fill the vacancy. The vacancy is filled by the governor's office.

 

DIRECTOR’S REPORTS

 

Service Director Knecht - Mr. Knecht stated leaf collection remains underway, with crews working six days a week and ten-hour shifts, and residents are encouraged to place leaves at the curb as soon as possible. As the City prepares for winter, Willoughby and many Northeast Ohio communities are facing a significant road salt shortage due to the closure of the Morton Salt Mine in Fairport Harbor. He stated that of the 6,000 tons of salt ordered for this season, the City will receive only about 1,900 tons. The City received an early delivery of 1,000 tons and is awaiting the remainder. Staff has coordinated with neighboring communities and explored alternative suppliers, but available salt is limited and prices are three to four times higher than state contract rates. In response, the City will increase its use of Beet Heet, a liquid deicing product that Council supported through the purchase of a new storage tank in this year's capital budget. Residents will notice a different approach to winter road treatment, with increased liquid applications and reduced visible salt. Beet Heet will be used both as a pre-treatment and in combination with salt to improve effectiveness, extend performance, and enhance roadway conditions during colder temperatures. He stated that because communities throughout the region are facing similar challenges, motorists should expect changing road conditions and allow additional travel time when necessary. In response to questions from Council, Mr. Knecht explained that the Fairport mine supplied numerous Northeast Ohio communities and that alternative suppliers currently cannot meet the shortfall. He noted the City's contracted salt price is approximately $66 per ton, compared to about $56 last year. He also expressed optimism that increased use of Beet Heet may reduce long-term dependence on salt while providing a less corrosive and more environmentally friendly treatment option. He stated that storm sewer and catch basin repairs on Lost Nation Road were planned as part of ongoing roadway maintenance and were completed in conjunction with the City's concrete program because it was the most cost-effective approach. He stated the asphalt contractor is expected to begin final paving later this week and that the project remains on schedule for completion before winter weather arrives.

 

City Engineer Lannon - Mr. Lannon stated that over the next two weeks, he expects all remaining road and sidewalk projects to be completed, bringing this year's construction season to a close.

 

Fire Chief Ungar - Chief Ungar congratulated Chief Schultz and the Police Department on this evening's appointments, promotions, and awards. He stated that the process of outfitting the new fire engine is progressing well. Much of the work is being completed in-house by firefighter Nick Bernakis, whose fabrication experience has allowed the department to perform the installation at an estimated savings of approximately $17,000. Because the current engine remains in service, equipment must be transferred and fitted to the new apparatus while ensuring the existing engine remains operational until the final changeover.

 

He stated that Mr. Tomaselli brought him an idea. Once the new engine is fully equipped and ready for service, the department plans to hold a traditional "push-in" ceremony to welcome the apparatus into the station. As many of the recent apparatus purchases have been made possible through the support of voters and the Safety Forces Levy, this will provide an opportunity to recognize that investment and celebrate this milestone with Council and the community. Once a firm date is established, he will coordinate with Council so members and, if desired, representatives from their wards may participate in the event.

 

Police Chief Schultz - Chief Schultz thanked Council for hosting the Heroes Night.

 

Parks & Recreation Director Keller - Ms. Keller thanked Council for approving the change order for Osborne Park. She reminded everyone that the Downtown Willoughby Tree Lighting Ceremony will take place on December 3rd at 7:00 p.m.

 

In response to the resident who spoke earlier tonight about AEDs, Ms. Keller stated that a state law enacted at the end of 2024 requires recreation facilities and sports complexes to have automated external defibrillators (AEDs) available on-site. To comply with these requirements and enhance public safety, the Parks and Recreation Department purchased three additional AEDs this year. These units will be deployed among athletic programs based on seasonal needs, such as baseball in the spring and football in the fall. Additionally, the department is exploring the installation of permanent AEDs throughout the park system to improve emergency preparedness and public access to lifesaving equipment.

 

 

 

COUNCIL REPORTS

 

No major reports

 

ADJOURNMENT

 

The Regular Council Meeting adjourned at 8:12 p.m.

 

 

EXHIBIT A.

 

CITY OF WILLOUGHBY, OHIO

Public Comment Submitted for the Meeting Record

City Council Meeting: November 17, 2026 Submitted by: Heath Wenzel

Subject: Flock License Plate Reader Program and Public Oversight

Good evening, members of Council.

I'd like to begin by thanking Council President Bob Carr for responding to my concerns regarding the Flock camera program. I appreciate you speaking with John, the Safety Committee chair, and confirming that the current agreement is being reviewed, with plans for further discussion.

I appreciate that follow-through.

I recently had a conversation with a friend in law enforcement about Flock cameras.

He believes they're an extremely valuable tool. And I told him, I'm not disputing that. What I'm asking for is guardrails and oversight.

What stayed with me was his acknowledgment that he understood my concerns from a citizen's point of view. And I've thought quite a bit about those words.

Because when you strip away the titles, police chief, council member, business owner, whatever role we happen to hold, we're all citizens.

We share the same fundamental rights, and we all have a responsibility to protect them.

I think that's something worth remembering when we're discussing government authority and the technology we allow it to use.

There's an analogy that frequently comes up in these discussions. We carry cell phones everywhere, and those devices can reveal where we've been. So what's the difference?

Well, I think there's an important distinction.

A license plate being visible on a public road is one thing. Having those observations collected, stored, and connected across an expanding network of cameras, creating a searchable history of someone's movements, is something entirely different.

And just because technology makes something possible doesn't necessarily mean we've adequately considered whether it's appropriate.

The question isn't simply whether this technology helps solve crimes. We've already established that it can.

The question is what happens when it's misused, when information is inaccurate, or when its capabilities expand beyond what was originally intended.

These are questions about safeguards, accountability, and the limits of government authority. And they deserve consideration before something goes wrong, not afterward.

As the Safety Committee reviews the current agreement, I hope the discussion extends beyond contract dates and costs to include independent audits, information sharing, and meaningful public oversight.

Because ultimately, this isn't about choosing between supporting law enforcement and protecting civil liberties. We should be capable of doing both.

And I believe that's a responsibility we all share. Thank you.

Submitted to the Clerk of Council for inclusion in the meeting record.

 

 

COMMENTS BY COUNCILMAN KARY

HAPPY THANKSGIVING 

 

 

 

 

NOTE

 

The views I express in these Council Meeting Summaries are my own and do not reflect any official view or position of the City of Willoughby.  The “official” Council Minutes are posted on the

City of Willoughby Website

https://willoughbyohio.com/city-council/

 